Boeing halts 777X tests after engine damage

Boeing Co has paused flight tests of its 777X jetliner while it inspects the four-aircraft fleet for cracking in a crucial structural component that mounts the hulking General Electric engines to the plane’s wings.

The planemaker said it discovered a damaged thrust link on a 777-9 during routine maintenance following a test flight. 

The component “didn’t perform as designed,” the company said in a statement. Boeing plans to replace the engine mount and “will resume flight testing when ready,” it said.

The issue marks the latest setback to Boeing’s effort to certify its largest jetliner, which is already about five years behind schedule, after the company finally began flight tests with US regulators on board in July, a key milestone. 

The company has been embroiled in crisis since a midair blowout on one of its jets early this year threw a spotlight on its manufacturing and safety record.

“The grounding could push 777X delivery expectations to the right, and potentially into 2026,” Ken Herbert, an analyst with RBC Capital, told clients in a note Monday. He predicted the 777X programme would likely encounter a “prolonged approval period.”

Boeing said it is inspecting other jets in the 777X flight test fleet for the issue. No near-term flight tests were planned for those airplanes. GE Aerospace said there is no issue with the GE9X turbofan, which is the largest and most powerful commercial jet engine ever built.

Boeing said it notified the Federal Aviation Administration and customers about the issue on the engine mount, which is custom-designed for the 777-9, the first jet to be developed in the 777X family.

The agency said the flight test that preceded the discovery occurred last week, confirming an earlier report by the Air Current. — Bloomberg.

Related Posts

Mega Market moves to snap up Lobels in bid to dominate food value chain

Nelson Gahadza Mega Market (Private) Limited, owned by Shiraan Ahmed, has moved to acquire 100 percent of Lobels Holdings (Private) Limited in a proposed transaction that could see one of…

Super El Niño: President urges caution

Joseph Madzimure and Precious Manomano FARMERS must prioritise early-maturing and drought-resistant crops for the 2026-2027 summer cropping season as Zimbabwe braces for a likely Super El Niño-induced dry spell, President…

Leave a Reply

Your email address will not be published. Required fields are marked *