President arrives in Hwange for power expansion project commissioning

Prosper Ndlovu in Hwange

President Mnangagwa has arrived in Hwange to lead proceedings in the official commissioning of the US$1,5 billion Hwange Power Station Units 7 and 8 Expansion Project.

The two units have 300MW capacity each, and have been built through a loan support from the People’s Republic of  China.

President Mnangagwa is being accompanied by his deputy, Dr Constantino Chiwenga, Finance and Economic Development Minister Prof Mthuli Ncube, Energy and Power Development Minister, Zhemu Soda, Agriculture Minister, Dr Anxious Masuka, Mat North and Devolution Minister, Richard Moyo, Speaker of Parliament Advocate Jacob Mudenda, senior Government officials, Zesa executives

The investment is one of the massive signature developments projects implemented under the Second Republic, which are already impacting positively on local communities and the country as a whole.

 

 

 

Related Posts

CCZ calls for collective action on food safety

Nqobile Bhebhe, [email protected] THE Consumer Council of Zimbabwe (CCZ) has called for a collective approach to food safety saying the responsibility does not rest solely on regulators or consumers, but…

Presidential Borehole Scheme brings hope to Cowdray Park residents

Vusumuzi Dube, Deputy Radar Editor The launch of the Presidential Borehole Scheme in Cowdray Park has been hailed as a significant step towards addressing Bulawayo’s long-standing water challenges, with city…

Leave a Reply

Your email address will not be published. Required fields are marked *

×
×