President arrives in Hwange for power expansion project commissioning

Prosper Ndlovu in Hwange

 President Mnangagwa has arrived in Hwange to lead proceedings in the official commissioning of the US$1,5 billion Hwange Power Station Units 7 and 8 Expansion Project.

The two units have 300MW capacity each and have been built through loan support from the People’s Republic of  China.

President Mnangagwa is being accompanied by his deputy, Dr Constantino Chiwenga, Finance and Economic Development Minister Prof Mthuli Ncube, Energy and Power Development Minister, Zhemu Soda, Agriculture Minister, Dr Anxious Masuka, Mat North and Devolution Minister, Richard Moyo, Speaker of Parliament Advocate Jacob Mudenda, senior Government officials, Zesa executives

The investment is one of the massive signature development projects implemented under the Second Republic, which is already impacting positively on local communities and the country as a whole.

Related Posts

BUSE takes science and innovation to higher level President caps 2371 at Bindura graduation

Debra Matabvu, [email protected] PRESIDENT Mnangagwa yesterday capped 2371 graduates at the Bindura University of Science Education (BUSE) 25th graduation ceremony with the institution pledging to continue producing graduates who contribute…

Ngozi Mine: Ngozi Mine: At last, a breath of hope for Cowdray Park

Bruce Ndlovu, [email protected] FOR years, residents of Cowdray Park have learnt to fear the wind. When it changes direction, smoke from the nearby Richmond Landfill, popularly known as Ngozi Mine,…

Leave a Reply

Your email address will not be published. Required fields are marked *