Watch: Premier African Minerals receives key plant component for lithium production at Fort Rixon Mine

Senior Business Writer

PREMIER African Minerals Limited on Saturday took delivery of a mill, a strategic component of the plant production.

In recent weeks, the mining entity with operations at Fort Rixon lithium mine in Matabeleland South Province has been taking delivery of an assortment of strategic plant components and upscaling installment.

It eyes production this month.

The mining entity has set monthly production target of up to 1 000 tonnes of spodumene.

Spodumene is a battery-grade product, which is key for the future of electric cars.

In November last year, the mining entity said plant operations had been partially suspended to allow for civil construction to commence in preparation for the installation of the 55 tonnes per hour ball mill and other associated structures.

The lithium firm has shared videos of trucks delivering the mill.

Related Posts

Presidential Borehole Scheme brings hope to Cowdray Park residents

Vusumuzi Dube, Deputy Radar Editor The launch of the Presidential Borehole Scheme in Cowdray Park has been hailed as a significant step towards addressing Bulawayo’s long-standing water challenges, with city…

Zimbabwe scoops top honour at Zambia Travel Expo

Nqobile Bhebhe, [email protected] Zimbabwe has clinched First Runner-Up spot in the Best International Stand category at the ongoing Zambia Travel Expo (ZATEX) 2026, a significant achievement that underscores the country’s…

Leave a Reply

Your email address will not be published. Required fields are marked *

×
×