HERALD

IN PICTURES: Herald House 1962 — From a hole in the ground to a landmark

From a hole in the ground in February 1962 to a building lit up at night in May 1963 — and, twenty years later, home to a 260-tonne printing press — the story of Herald House is told in a new set of photographs from The Herald Archive.

The pictures, released by the Zimpapers Knowledge Centre, trace the construction of the newspaper’s Harare home, frame by frame.

First, a hole in the ground — 28 February 1962

The Rhodesia Herald, 28.2.62 · The Herald Archive / Zimpapers Knowledge Centre

Marked “The Rhodesia Herald”, this print shows men and lorries working the excavation, with timber poles and shuttering rising at the back and an older building looking on.

It is the beginning: before the building, there was only earth to be moved.

The building takes shape — 31 October 1962

New Herald, 31.10.62 · The Herald Archive / Zimpapers Knowledge Centre

The cover image shows the steel frame and scaffolding rising, with a Lewis crane towering over the site.

Glass goes in while the scaffolding stays up — 30 January 1963

Progress — New Herald, 30.1.63 · The Herald Archive / Zimpapers Knowledge Centre

The print is marked “Progress — New Herald”. The left-hand block is already glazed, while the centre of the building is still wrapped in scaffolding, with hoarding screening the pavement.

The trumpeter takes his place — 29 April 1963

New Herald, 29.4.63 · The Herald Archive / Zimpapers Knowledge Centre

Three months on, vertical fins line the facade and the herald-and-trumpet figure is fixed to the corner of the building. The scaffolding has come down, the hoarding still stands.

Lit up for the night — 28 May 1963

Herald House, 28.5.63 · The Herald Archive / Zimpapers Knowledge Centre

A month later, the photographer came back after dark. Every floor is lit and the “Herald House” name is fixed above the entrance.

Then came the press — 1983

Twenty years after those photographs, Herald House was readied for a 260-tonne Goss Metroliner press. “Stage 1”: a carefully levelled concrete screed, with Y-shape supports laid out ready to take the press’s weight.

16 June 1983: Inside Herald House
25 October 1983 · “Stage 1”

The 260-tonne press, put through its paces — October 1983

Goss Metroliner trial run, 25.10.83 · The Herald Archive / Zimpapers Knowledge Centre

A trial run of the Goss Metroliner, photographed on 25 October 1983. Scanned from a negative, converted to positive for this post.

The Archive Is Open

Over a century of The Herald, The Sunday Mail and more is now kept for the public.
The Zimpapers Knowledge Centre offers:

• Search library files and bound volumes
• Licence historic photographs
• Scan and copy articles and pages
• Commissioned research from archivists
• Tributes, anniversaries and commemorative products

For enquiries, email: [email protected]

Leave a Comment