Main Cartoon 25 February 2022

Related Posts

Bindura’s 34-year water wait ends

Oliver Kazunga Senior  Reporter A WATER project conceived in 1992 has finally become reality, with Bindura commissioning a 22,1-kilometre pipeline to bolster the town’s unreliable water supply. The US$3 million…

Beitbridge town hit by water crisis after major pumping main fault

Thupeyo Muleya Beitbridge Bureau The border town of Beitbridge is facing a water crisis following a major breakdown on the main pumping line, leaving the entire town without running water.…

Leave a Reply

Your email address will not be published. Required fields are marked *