Irrigation scheme seeks US$10m for canal

The money will also help in building a water conveyance canal that will link the scheme with Muzhwi Dam in Chirumhanzu.
Spreading over 900ha, Mushandike irrigation scheme has been affected by a severe shortage of water blamed on incessant siltation of Mushandike Dam. Irrigated crops at the scheme, that has 1 000 plot-holders, have been wilting due to lack of water.

Mushandike Irrigation Scheme Farmers’ Trust patron Mr Rogers Mat­sikidze said the estimated 40km-canal will bring an end the water woes that have been stifling operations at the scheme. He said feasibility studies for the building of the canal have already been completed.

“One of the major problems affect­ing operations at Mushandike Scheme is lack of water so we hope the canal will draw water from Muzhwi into Mushandike so that the 1 000 plot holders can overcome perennial water problems that have seen crops wilting due to shortage of water.”

 

Related Posts

Economy: Growth signs visible

Martin Kadzere Senior Business Reporter ZIMBABWE has made significant progress towards achieving upper-middle-income status, with the country’s Gross National Income per capita growing by 84 percent since 2021, Finance, Economic…

Gold to shield Zim from Middle East conflict fallout: AfDB

Africa Moyo Deputy National Editor ZIMBABWE’S strong gold sector and broad resource base are expected to cushion the economy against the economic fallout from the escalating conflict in the Middle…

Leave a Reply

Your email address will not be published. Required fields are marked *

×